PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Door frames at the 3rd floor Waiting Area 352 Facing North.jpg Installing door frames at the 3rd floor Facing South.jpg Installing duct work at the 4th floor Facing West.jpg Installing ductwork at the 4th floor Facing South.jpg Installing sheating along the parapet of the High Roof Facing East.jpg Interior electrical at the 2nd floor Facing East (2).jpg Laying out block along 2nd floor column line H between 5-3.3 Facing East.jpg Storm piping at the High Roof.jpg
Previous pageNext page Installing sheating along the parapet of the High Roof Facing East
Installing sheating along the parapet of the High Roof Facing East